FEL Type Budgets (Front end Loading)
Your Path to Success
Ready to take your project to the next level? Discover how the Front-End Loading (FEL) methodology can transform your ideas into tangible successes.
FEL 1 Budget: Opportunity Identification
In this initial stage, we explore business opportunities through technical-economic feasibility studies to validate the idea's viability. Is it profitable? Does it have potential? This stage closes previous gates to advance to the next phase. Investment approximation with a margin of -30%/+50%.
FEL 2 Budget: Conceptual Project
In this phase, we shape the project, like sketching a painting before creating it. Objectives are defined, alternatives proposed, and the foundations for detailed design established. Creativity and precision merge to create a clear vision. Investment approximation with a margin of -20%/+40%.
FEL 3 Budget: Basic Project
The final stage before execution builds a solid foundation for success. The complete scope is developed, an execution plan is created, and the team is formed. The final investment estimate is carried out with surgical precision. Every detail matters for achieving exceptional results. Investment approximation with a margin of -10%/+10%. At this stage, we have detailed DT'IS, DF'PS, appropriate technology selection, design drawings at a "C" review, market research, process equipment arrival, electrical equipment, all aligned with ISO 9001 quality, ISO/IEC 27001 information security, NOM, ASME, ANSI, NEC, ISA, and applicable standards depending on the project type.
In summary, the FEL methodology is not just a process but a promise of success. If you seek well-planned, transparent projects with proven results, you are on the right path! Contact us today and discover how we can turn your vision into a tangible and successful reality.
SUCCESS CASES:
* FEL 3 COST ESTIMATE, PRE-ENGINEERING, CONCEPT CATALOG, UNIT PRICES, MARKET RESEARCH DEVELOPED FROM A DT'I FOR THE REVAMPING OF THE D-25 PLANT (STORAGE) OF MEXICHEM-QUIMIR S.A. DE C.V. AT THE LECHERÍA PLANT, CLIENT MEXICHEM-QUIMIR.
* FEL 3 COST ESTIMATE, PRE-ENGINEERING AND COST ESTIMATE WITH ± 20% ACCURACY FOR THE CONSTRUCTION OF A FERRIC CHLORIDE PRODUCTION PLANT FOR MEXICHEM-QUIMIR S.A. DE C.V. AT THE TULTITLAN PLANT, CLIENT MEXICHEM-QUIMIR.
* FEL 3 COST ESTIMATE, PRE-ENGINEERING AND COST ESTIMATE WITH ± 30% ACCURACY FOR THE CONSTRUCTION OF A HYDROCHLORIC ACID PRODUCTION PLANT FOR MEXICHEM-QUIMIR S.A. DE C.V. AT THE TULTITLAN PLANT.
* FEL 3 COST ESTIMATE, ENGINEERING, DESIGN, EXECUTIVE PROJECT DEVELOPMENT AND COST ESTIMATE INTEGRATION WITH ± 20% ACCURACY FOR THE INSTALLATION OF A PHOSPHORIC ACID PRODUCTION PLANT FROM ROCK IN VERACRUZ FOR MEXICHEM-QUIMIR S.A. DE C.V.
* FEL 3 COST ESTIMATE, ENGINEERING, DESIGN, EXECUTIVE PROJECT DEVELOPMENT AND COST ESTIMATE INTEGRATION WITH ± 20% ACCURACY FOR THE INSTALLATION OF A PHOSPHORIC ACID PRODUCTION PLANT FROM TAILINGS IN COAHUILA FOR MEXICHEM-QUIMIR S.A. DE C.V.